-
Featured services
Think beyond the robots
The successful integration of AI and IoT in manufacturing will depend on effective change management, upskilling and rethinking business models.
Read the blog -
Services
Leverage our capabilities to accelerate your business transformation.
-
Services
Network as a Service
Popular Products
-
Private 5G
Our turnkey private 5G network enables custom-built solutions that are designed around unique use cases and strategies, and deployed, run and optimized through a full network-as-a-service model.
-
Managed Campus Networks
Our Managed Campus Networks services transform campus networks, corporate area networks and interconnected local area networks, and connect smart places and industries.
-
-
Services
Cloud and IT Infrastructure
Popular Products
-
Cloud Architecture and Modernization
Discover how to achieve your business goals through cloud modernization practices, that deliver improved agility, reusability and scalability.
-
Cloud Optimization
Discover how to maximize operational excellence, business continuity and financial sustainability through our cloud-advanced optimization services.
-
-
Services
Edge as a Service
Client stories
-
Penske Entertainment and the NTT INDYCAR SERIES
Together with Penske Entertainment, we’re delivering digital innovations for their businesses – including INDYCAR, the sanctioning body of the NTT INDYCAR SERIES – and venues such as the iconic Indianapolis Motor Speedway, home to the Indianapolis 500.
-
Using private wireless networks to power IoT environments with Schneider Electric
Our combined capabilities enable a secure, end-to-end digital on-premises platform that supports different industries with the benefits of private 5G.
-
-
Services
Technology Solutions
Client stories
-
Services
Global Data Centers
-
Services
Digital Collaboration and CX
NTT DATA a Leader in IDC MarketScape
IDC MarketScape: Worldwide Cloud Professional Services 2024 Vendor Assessment.
Get the excerpt -
-
-
Insights
Recent Insights
-
The Future of Networking in 2025 and Beyond
-
Using the cloud to cut costs needs the right approach
When organizations focus on transformation, a move to the cloud can deliver cost savings – but they often need expert advice to help them along their journey
-
Make zero trust security work for your organization
Make zero trust security work for your organization across hybrid work environments.
-
-
Copilot for Microsoft 365
Everyone can work smarter with a powerful AI tool for everyday work.
Explore Copilot today -
-
2024 Infrastructure Lifecycle Management Report
Realize the benefits of effective hardware and software management.
Infrastructure report -
Discover how we accelerate your business transformation
-
About us
CLIENT STORIES
-
Liantis
Over time, Liantis – an established HR company in Belgium – had built up data islands and isolated solutions as part of their legacy system.
-
Randstad
We ensured that Randstad’s migration to Genesys Cloud CX had no impact on availability, ensuring an exceptional user experience for clients and talent.
-
-
CLIENT STORIES
-
Liantis
Over time, Liantis – an established HR company in Belgium – had built up data islands and isolated solutions as part of their legacy system.
-
Randstad
We ensured that Randstad’s migration to Genesys Cloud CX had no impact on availability, ensuring an exceptional user experience for clients and talent.
-
-
CLIENT STORIES
-
Liantis
Over time, Liantis – an established HR company in Belgium – had built up data islands and isolated solutions as part of their legacy system.
-
Randstad
We ensured that Randstad’s migration to Genesys Cloud CX had no impact on availability, ensuring an exceptional user experience for clients and talent.
-
Everest Group PEAK Matrix® Assessment
NTT DATA is a Leader and Star Performer in the Everest Group Sustainability Enablement Technology Services PEAK Matrix® Assessment 2024.
Get the Everest report -
- Careers
Topics in this article
The expansion of our Munich 2 Data Center with Building B continues to move forward as the fit-out progresses.
The L4 testing and commissioning process has recently started, which is commonly known as final system testing. The open colo fit-out installation is still due to be completed, but the project is on time and the construction team is scheduled to hand over to the operations team by 27th November 2020. Once Building B is completed, the Munich 2 campus will provide around 6,200m2 of IT space and 14 MW of IT load for clients.
Clients and partners can choose from a wide range of flexible, scalable data center services and multiple carrier and cloud connectivity options are available – supporting the region’s large industrial and manufacturing base as well as new economy technology companies and start-ups.
We have over 20 years of local experience and expertise in the German market, and when combined with our worldwide connected platform and our portfolio of global technology solutions, we are an enabler of growth and innovation for our clients.
In addition, our Munich 2 Data Center will receive the ‘DE-CIX Enabled Site’ certification with the launch of its second facility, building B at the end of 2020. This means that the interconnection services of DE-CIX are available to our clients directly on-site. Through this cooperation, we provide the data center infrastructure, while DE-CIX operates its own network hardware within the data center.
Watch our video to view a time lapse of the construction progress. If you have any questions about how we can help you with Munich 2, please don’t hesitate to contact us.